Top of page. Skip to main contents. Skip to main menu. Skip to footer.
HOME > Technology > Technical ReviewVolume 43  Number 4  > US-APWR for Deployment in the United States
Mitsubishi Heavy Industries Technical Review
 Volume 48 (2011)
 Volume 47 (2010)
 Volume 46 (2009)
 Volume 45 (2008)
 Volume 44 (2007)
 Volume 43 (2006)
 Volume 42 (2005)
 Volume 41 (2004)
 Volume 40 (2003)
 Volume 39 (2002)
 Volume 38 (2001)
 Volume 37 (2000)
 Volume 36 (1999)
 Volume 35 (1998)
 Volume 34 (1997)
 Volume 33 (1996)
 Volume 32 (1995)
 Volume 31 (1994)
Mitsubishi Heavy Industries Technical Review
 Volume 43 Number 4  Technology for Nuclear Power Generation
 English: 371KB/Now download pdf file
 Japanese: 807KB/Now download japanese pdf file
US-APWR for Deployment in the United States


Masahiko Kaneda, Atsushi Tomita, Masayuki Kambara, Atsushi Kumaki, Keizo Okada, Hiroshi Mukai


The US-APWR, developed especially for use in the United States, is an economically efficient, reliable, safe, and well-proven 1,700 MW class plant based on the advanced pressurized water reactor (APWR), which has been already developed in Japan. It utilizes the latest and best technology such as high-performance steam generators and turbines, complies with US regulatory requirements such as enhanced safety power systems, reflects US customer needs such as reduced generation costs for long cycle operation, and applies US site conditions which enable a compact building layout based on moderate seismic conditions. The design certification (DC) application to the U.S. Nuclear Regulatory Commission (NRC) is scheduled for December 2007 and efforts to obtain orders will be strengthened, targeting electric utilities in the US.