Singapore Esplanade Theatre
![]() |
Owner : The Esplanade Co. Ltd.
Delivery : Oct 2002
Lyric Theatre
Over stage machinery
| Fly set (MO-BHDW2) | 109 sets |
|---|---|
| Movable point hoist (MO-FPH3) | 24 sets |
| House curtain | 1 set |
| Windlass | 22 sets |
| Rear and Side stage suspension | 20 sets |
| Chain hoist | 12 sets |
| Adjustable proscenium | 2 sets |
| Safety curtain, Acoustic door | 3 sets |
| Acoustic curtain | 21 sets |
| Loud speaker hoist and attached movable ceiling | 3 sets |
Under stage machinery
| Main stage elevator (19m×15m : Spiral jack) | 1 set |
|---|---|
| Orchestra elevator (Spiral jack) | 3 sets |
| Seating wagon, Ballet wagon, Piano elevator, Carpet elevator |
Feature
- 3-stage theatre which enables full-fledged operas and dramas (Lyric Theatre)
- Proscenium opening 17.85m, Height 11m
- Additional under stage machinery to be installed later
- The largest theatre complex facility in South East Asia.
- Construction period : 42 months
Concert Hall
Over stage machinery
| Movable point hoist (MO-FPH3) | 51 sets |
|---|---|
| Acoustic reflector | 3 sets |
| Chain hoist | 12 sets |
| Reverberation chamber door | 58 sets |
| Acoustic curtain | 53 sets |
| Truss batten | 7 sets |
| Windlass | 10 sets |
Control system of Lyric & Concert Hall
Bytecraft State IV Control system