Top of page. Skip to main contents. Skip to main menu. Skip to footer.
Main contents start here.

Pump installation work

1.Arrival at the site 2.Extension of the boom
3.Hoisting of the drainage pump 4.Introduction of the drainage pump

Business contact: Power Systems -

Return to top.
Page Top