Top of page. Skip to main contents. Skip to main menu. Skip to footer.

Main contents start here.

Supply Result

Year Customer Equipment Remarks (specifications)
1963 For the university 20cm Hypersonic Wind Tunnel Type : Heating Blow-down Type
Measuring Section : φ 200mm
Mach Number Irregular : 7, 8, and 9
Total Pressure : 4.9MPa
Total Temperature : 600°C
1964 For the laboratory Hypersonic Wind Tunnel Type : Heating Blow-down Type
Measuring Section : φ 500mm
Mach Number : 5,7,9 and 11(selectable)
Total Pressure : 9.8MPa
Total Temperature : 1,000°C
1966 For the university Hyper-speed Aerodynamic Experimental Facility Type : Blow-down Type
Measuring Section : 150×150mm
Mach Number : 2 to 5
Stagnation Temperature : 600°C
Duration Time : 5 minutes

1995

For the laboratory Upsized Hypersonic Wind Tunnel (Large Hypersonic Wind Tunnel) Type : Blow-out with Vacuum Suction Intermittent Type
Mach Number : 10
Nozzle Outlet Diameter : φ 1,270mm
Total Pressure : 1 to 9.9 MPa
Total Temperature : 1073K5
Blowing Time : Vacuum Tank Capacity:2,300m3
  20 seconds or more in use
Compressed Air source : 18m3 × 2 Units
(alternately used)   × max. 19.7 MPa
Heater :
Alumina-pebble Heat Accumulator Type
Vacuum Tank :
1150m3 × 2units + 2300m3 × 1unit

Return to top.
Page Top