| Hokkaido Electric Power
Takikawa Technical Center Operation Training Simulator |
|
| Model Plant |
: |
| (1) |
TomatoatsumaThermal Power Station #4 Unit
Plant capacity: 700MW, Coal fired plant, Boiler type: Sliding pressure operation
|
| (2) |
Shiriuchi Thermal Power Station #2 Unit
Plant capacity: 350 MW, Oil fired or Orimulsion fired plant,
Boiler type: Sliding pressure operation |
| (3) |
Date Thermal Power Station #1 Unit
Plant capacity: 350 MW, Oil fired plant, Boiler type: Drum |
| (4) |
Sunagawa Thermal Power Station #3 Unit
Plant capacity: 350 MW, Coal fired plant, Boiler type: Drum |
|
| Feature |
: |
| (1) |
One of the biggest class Simulator in Japan being able to easily switch between
4 plants models. |
| (2) |
Simulator is to accurately reproduce the static and dynamic Characteristics
of a plant. |
| (3) |
CAI(Computer Aided Instruction) is integrated into the Simulator. |
| (4) |
A panorama vision made up of eight interconnected 50-inch projectors. |
|
Full view of Simulator

A panorama vision
| (1) |
A panorama vision made up of eight interconnected 50-inch projectors. |
| (2) |
Use for
| 1. |
Panel for 4 units operation |
| 2. |
VDU screen of CAI |
| 3. |
Multi screen for multi purpose |
|
|
|