| A prudent development of APWR has been performed, based on the results of the third improvement and standardization program by joint effort of the public and private sectors, which began in 1982, adopting experiences in operation and maintenance of conventional PWR plants and the state of the art technologies, and incorporating the technologies of further advancement. For APWR, MHI strived to achieve the harmonization with the environment, enhanced safety, improved reliability and economy, and enhanced operability and maintainability to meet the need of the times. The APWR plants were selected for Tsuruga units 3 and 4, scheduled to begin operation in 2016 and 2017. |
|
|
 |
 |
 |
|
Compilation of the plant technologies(design, manufacturing, installation, operation and maintenance) adopted in the previously built 23 units |
|
|
|
|
|
Since the introduction of foreign technologies for the first-generation plants, Mitsubishi has been working on independently upgrading of technologies and enhancement of economy in second and third generation plants.
Through further efforts of improvement and development, Mitsubishi compiled these efforts into the fourth generation advanced PWR plants. |
|
|
|
|
|
|
|
|
 |
|
|
Advanced PWR(APWR) plants, based on the current 4-loop plants that have a plenty of operating experience and excellent characteristics, adopt high-performance large capacity equipments to improve the reliability and safety features, such as enhanced defense in-depth, as well as have a simplified system configuration that can facilitate operating management |
|
|
![[figure]System configuration of APWR plant](image/org_01.gif)
![[figure]System configuration of APWR plant](image/org_02.gif)
| |
|
 |
|
|
- Electrical output attained a large capacity with 30 percent improvement(1,530 MWe), as compared to the current 4 loop.
- Larger major components accommodating to the increased output
- Adopted high-performance reactor core, enabling MOX and long cycle operation
- Installed high-performance instrumentation & control system by adopting integrated digital equipments.
|
![[figure]Pursue of economical efficiency](image/a0103_01.jpg) |
|
|
|
 |
|
|
- Further enhancement of economy and effective sitting became of scaling-up of capacity
- Pursued simplified systems and components thoroughly
- components thoroughly
|
![[figure]Pursue of economical efficiency](image/a0103_02.gif) |
|
|
|
|
|
|
|
|
|
|
|
|
It moves to each page when clicking. |
 |
 |
 |
 |
 |
|
|
|
|
|
|
|
|
|
1.Improved Economy
Nuclear Energy Systems Headquarters
All Rights Reserved, Copyright(C) 2005, MITSUBISHI HEAVY INDUSTRIES,LTD. |
|
|
|